{"id":1160,"date":"2026-09-28T03:39:52","date_gmt":"2026-09-28T03:39:52","guid":{"rendered":"https:\/\/wdlvalve.com\/?p=1160"},"modified":"2026-09-28T03:39:52","modified_gmt":"2026-09-28T03:39:52","slug":"%d8%af%d9%84%d9%8a%d9%84-%d8%b5%d9%85%d8%a7%d9%85-%d8%a7%d9%84%d9%83%d8%b1%d8%a9-%d8%a7%d9%84%d9%85%d8%a8%d8%b1%d8%af-%d8%b0%d9%8a-%d8%a7%d9%84%d9%85%d8%af%d8%ae%d9%84-%d8%a7%d9%84%d8%ac%d8%a7%d9%86","status":"publish","type":"post","link":"https:\/\/wdlvalve.com\/ar\/%d8%af%d9%84%d9%8a%d9%84-%d8%b5%d9%85%d8%a7%d9%85-%d8%a7%d9%84%d9%83%d8%b1%d8%a9-%d8%a7%d9%84%d9%85%d8%a8%d8%b1%d8%af-%d8%b0%d9%8a-%d8%a7%d9%84%d9%85%d8%af%d8%ae%d9%84-%d8%a7%d9%84%d8%ac%d8%a7%d9%86\/","title":{"rendered":"\u0635\u0645\u0627\u0645 \u0643\u0631\u0648\u064a \u0645\u0628\u0631\u062f \u0630\u0648 \u0645\u062f\u062e\u0644 \u062c\u0627\u0646\u0628\u064a \u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0627\u062a \u0627\u0644\u063a\u0627\u0632 \u0627\u0644\u0637\u0628\u064a\u0639\u064a \u0627\u0644\u0645\u0633\u0627\u0644: \u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0648\u0627\u0644\u0627\u062e\u062a\u064a\u0627\u0631"},"content":{"rendered":"<article style=\"max-width: 1180px; margin: 0 auto; padding: 20px 16px; color: #17212b; font-family: Arial,Helvetica,sans-serif; font-size: 17px; line-height: 1.75; box-sizing: border-box;\">\n<header style=\"margin-bottom: 28px;\">\n<p style=\"margin: 0px; font-size: 19px; text-align: left;\">A <strong>side entry cryogenic ball valve for LNG service<\/strong><br \/>\nuses a two-piece or three-piece body, low-temperature materials<br \/>\nand an extended stem to provide reliable quarter-turn isolation<br \/>\nat temperatures down to \u2212196\u00b0C. Correct seat design, body-cavity<br \/>\nrelief and cryogenic testing are essential because trapped LNG<br \/>\nexpands rapidly when it warms.<\/p>\n<\/header>\n<figure style=\"margin: 0 0 30px; text-align: center;\"><a href=\"https:\/\/wdlvalve.com\/ar\/product\/%d8%b5%d9%85%d8%a7%d9%85-%d9%83%d8%b1%d9%88%d9%8a-%d9%85%d8%a8%d8%b1%d8%af-%d8%b0%d9%88-%d9%85%d8%af%d8%ae%d9%84-%d8%ac%d8%a7%d9%86%d8%a8%d9%8a\/\"><br \/>\n<img fetchpriority=\"high\" decoding=\"async\" style=\"display: block; width: 100%; max-width: 650px; height: auto; margin: 0 auto; border: 1px solid #d6dee5; border-radius: 8px;\" src=\"https:\/\/wdlvalve.com\/wp-content\/uploads\/2026\/09\/ChatGPT_\u56fe\u50cf_2026\u5e749\u670828\u65e5_10_36_54.png\" alt=\"WDL side entry cryogenic ball valve for LNG service\" width=\"500\" height=\"500\" \/><br \/>\n<\/a><figcaption style=\"margin-top: 10px; color: #52606d; font-size: 14px;\">WDL Side Entry Cryogenic Ball Valve for LNG and low-temperature<br \/>\nprocess isolation.<\/figcaption><\/figure>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">What Is a Side Entry Cryogenic Ball Valve?<\/h2>\n<p>A side entry cryogenic ball valve is assembled through body<br \/>\nsections that split across the pipeline axis. The construction<br \/>\nmay use two or three main body pieces. This arrangement provides<br \/>\na practical combination of pressure containment, manufacturing<br \/>\nflexibility and access to the ball and seats during workshop<br \/>\nmaintenance.<\/p>\n<p>The extended stem places the packing, operator and actuator above<br \/>\nthe cold zone and pipe insulation. This limits heat transfer<br \/>\ntoward the process and helps the stem packing remain at a<br \/>\ntemperature where it can continue sealing effectively.<\/p>\n<\/section>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">Why Does LNG Service Require a Special Valve Design?<\/h2>\n<p>LNG is normally handled near \u2212162\u00b0C. At this temperature,<br \/>\nordinary valve materials, seals and lubricants may contract,<br \/>\nharden or lose toughness. A valve that works at ambient<br \/>\ntemperature may develop seat leakage, excessive torque or<br \/>\nstem-seal problems after cooling.<\/p>\n<p>A cryogenic LNG valve must therefore account for thermal<br \/>\ncontraction, low-temperature material toughness, heat transfer,<br \/>\nbody-cavity pressure and repeated cooling and warming cycles.<br \/>\nThe final design should be based on the minimum design<br \/>\ntemperature rather than only the normal operating temperature.<\/p>\n<\/section>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">Two-Piece vs. Three-Piece Side Entry Construction<\/h2>\n<div style=\"width: 100%; overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 16px 0 24px;\">\n<table style=\"width: 100%; min-width: 760px; border-collapse: collapse; border: 1px solid #111!important; background: #fff;\" border=\"1\" rules=\"all\" cellspacing=\"0\" cellpadding=\"0\">\n<thead>\n<tr style=\"background: #eaf2f8;\">\n<th style=\"border: 1px solid #111!important; padding: 12px; text-align: left;\">\u0646\u0642\u0637\u0629 \u0627\u0644\u0627\u062e\u062a\u064a\u0627\u0631<\/th>\n<th style=\"border: 1px solid #111!important; padding: 12px; text-align: left;\">Two-Piece Body<\/th>\n<th style=\"border: 1px solid #111!important; padding: 12px; text-align: left;\">Three-Piece Body<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Construction<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Main body plus one body connector<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Central body with two end connectors<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Body joints<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Fewer split-body joints<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">More assembly flexibility<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Maintenance<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Usually serviced after removal or workshop access<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">The center section may be easier to remove in suitable<br \/>\npiping layouts<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Selection basis<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Pressure, size, leakage risk and project standard<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Maintenance strategy, piping layout and project standard<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Neither arrangement is automatically better for every LNG<br \/>\nproject. The correct choice depends on valve size, pressure<br \/>\nclass, piping loads, available maintenance space, testing<br \/>\nrequirements and the owner\u2019s maintenance strategy.<\/p>\n<\/section>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">WDL Side Entry Cryogenic Ball Valve Range<\/h2>\n<p>WDL Valve publishes the following reference range for its<br \/>\n<a style=\"color: #1261a0;\" href=\"https:\/\/wdlvalve.com\/ar\/product\/%d8%b5%d9%85%d8%a7%d9%85-%d9%83%d8%b1%d9%88%d9%8a-%d9%85%d8%a8%d8%b1%d8%af-%d8%b0%d9%88-%d9%85%d8%af%d8%ae%d9%84-%d8%ac%d8%a7%d9%86%d8%a8%d9%8a\/\"><br \/>\n\u0635\u0645\u0627\u0645 \u0643\u0631\u0648\u064a \u0645\u0628\u0631\u062f \u0630\u0648 \u0645\u062f\u062e\u0644 \u062c\u0627\u0646\u0628\u064a \u0645\u062e\u0635\u0635 \u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0627\u062a \u0627\u0644\u063a\u0627\u0632 \u0627\u0644\u0637\u0628\u064a\u0639\u064a \u0627\u0644\u0645\u0633\u0627\u0644<br \/>\n<\/a>.<br \/>\nFinal ratings and dimensions must be confirmed on the approved<br \/>\nproject drawing.<\/p>\n<div style=\"width: 100%; overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 16px 0 24px;\">\n<table style=\"width: 100%; min-width: 760px; border-collapse: collapse; border: 1px solid #111!important; background: #fff;\" border=\"1\" rules=\"all\" cellspacing=\"0\" cellpadding=\"0\">\n<thead>\n<tr style=\"background: #eaf2f8;\">\n<th style=\"border: 1px solid #111!important; padding: 12px; text-align: left;\">\u0627\u0644\u0639\u0646\u0635\u0631<\/th>\n<th style=\"border: 1px solid #111!important; padding: 12px; text-align: left;\">Published WDL Specification<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Size range<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">DN25\u2013DN600 \/ NPS 1\u201324<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Body construction<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Two-piece or three-piece side entry body<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">\u0648\u0635\u0644\u0627\u062a \u0627\u0644\u0623\u0637\u0631\u0627\u0641<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Flanged, threaded, socket weld or butt weld, subject to<br \/>\nvalve size and project requirements<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Face-to-face<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">ASME B16.10 or project-specified standard<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">\u0646\u0637\u0627\u0642 \u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">\u2212196\u00b0C to +425\u00b0C, depending on material and seat selection<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">Cryogenic testing<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">BS 6364 or project-specified testing requirements<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">\u0627\u0644\u062a\u0634\u063a\u064a\u0644<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">\u0630\u0631\u0627\u0639\u060c \u0639\u0644\u0628\u0629 \u062a\u0631\u0648\u0633\u060c \u0645\u0634\u063a\u0644 \u0647\u0648\u0627\u0626\u064a \u0623\u0648 \u0645\u0634\u063a\u0644 \u0643\u0647\u0631\u0628\u0627\u0626\u064a<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">\u0645\u0648\u0627\u062f \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0647\u064a\u0643\u0644<\/td>\n<td style=\"border: 1px solid #111!important; padding: 12px;\">CF8\/F304, CF8M\/F316, CF3\/F304L, CF3M\/F316L or special<br \/>\nmaterials on request<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/section>\n<figure style=\"margin: 28px 0; text-align: center;\"><img decoding=\"async\" class=\"\" style=\"display: block; width: 256px; max-width: 620px; height: 342px; margin: 0px auto; border: 1px solid #d6dee5; border-radius: 8px;\" src=\"https:\/\/wdlvalve.com\/wp-content\/uploads\/2026\/09\/DM_20260928102918_004.jpeg\" alt=\"Side entry cryogenic ball valve with extended stem\" width=\"768\" height=\"1024\" \/><figcaption style=\"margin-top: 10px; color: #52606d; font-size: 14px;\">Extended-stem construction keeps the operating area above LNG<br \/>\npipe insulation.<\/figcaption><\/figure>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">Which Design Details Matter Most in LNG Service?<\/h2>\n<h3 style=\"font-size: 22px; color: #143852;\">Extended stem and packing location<\/h3>\n<p>The extension length must place the packing above the insulation<br \/>\nand expected frost line. This helps protect the packing and<br \/>\nprovides enough space for the handwheel, gearbox or actuator.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">Low-temperature material toughness<\/h3>\n<p>The body, stem, ball, bolting and pressure-containing parts must<br \/>\nremain suitable at the minimum design temperature. Material<br \/>\ncertificates and impact-test requirements should be stated in the<br \/>\ninspection plan.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">Seat contraction and leakage control<\/h3>\n<p>The ball, seat and seal materials contract at different rates<br \/>\nduring cooldown. The seat design must maintain contact without<br \/>\nproducing excessive operating torque.<\/p>\n<p>Soft-seat and metal-seat designs should be selected according to<br \/>\ntemperature, leakage requirements, operating frequency and fluid<br \/>\ncleanliness.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">Body-cavity pressure relief<\/h3>\n<p>LNG trapped between closed seats can expand as it absorbs heat.<br \/>\nThe valve needs an engineered cavity-relief arrangement, such as<br \/>\na defined self-relieving seat direction, to prevent unsafe<br \/>\npressure buildup.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0645\u0646 \u0627\u0644\u062d\u0631\u0627\u0626\u0642 \u0648\u0645\u0643\u0627\u0641\u062d\u0629 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0621 \u0627\u0644\u0633\u0627\u0643\u0646\u0629<\/h3>\n<p>LNG is flammable. Fire-safe construction and electrical<br \/>\ncontinuity may be specified depending on the installation and<br \/>\ngoverning standard. The RFQ should identify the exact<br \/>\nqualification and certificate required.<\/p>\n<\/section>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">Where Are Side Entry Cryogenic Ball Valves Used?<\/h2>\n<ul style=\"padding-left: 24px;\">\n<li>LNG storage tank inlet and outlet lines<\/li>\n<li>Ship, truck and terminal loading systems<\/li>\n<li>LNG transfer and circulation pipelines<\/li>\n<li>Regasification and boil-off gas systems<\/li>\n<li>Cryogenic pump isolation and bypass lines<\/li>\n<li>Liquid nitrogen, oxygen and argon systems<\/li>\n<li>Air-separation and low-temperature chemical plants<\/li>\n<\/ul>\n<\/section>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">What Testing Should Be Specified?<\/h2>\n<p>Ambient pressure testing alone does not demonstrate that a valve<br \/>\nwill seal and operate correctly at LNG temperature. The project<br \/>\nshould define whether cryogenic type testing, production testing<br \/>\nor both are required.<\/p>\n<ul style=\"padding-left: 24px;\">\n<li>Shell and seat pressure testing<\/li>\n<li>Cryogenic cooldown and leakage testing<\/li>\n<li>Operating-torque or functional testing at low temperature<\/li>\n<li>Material identification and impact testing<\/li>\n<li>Nondestructive examination of pressure-containing parts<\/li>\n<li>Fire-safe and fugitive-emission evidence when specified<\/li>\n<li>Cleaning, drying and sealed-packaging records<\/li>\n<\/ul>\n<p><a style=\"color: #1261a0;\" href=\"https:\/\/www.iso.org\/standard\/78445.html\" target=\"_blank\" rel=\"noopener noreferrer\"><br \/>\nISO 28921-1:2022<br \/>\n<\/a><br \/>\naddresses design, materials, manufacturing and production testing<br \/>\nfor industrial isolation valves used from \u221250\u00b0C down to \u2212196\u00b0C.<br \/>\nThe purchase specification should identify the required standard,<br \/>\nedition and any owner-specific additions.<\/p>\n<\/section>\n<figure style=\"margin: 28px 0; text-align: center;\"><img decoding=\"async\" style=\"display: block; width: 100%; max-width: 900px; height: auto; margin: 0 auto; border: 1px solid #d6dee5; border-radius: 8px;\" src=\"https:\/\/wdlvalve.com\/wp-content\/uploads\/2026\/09\/DM_20260928102918_005.jpeg\" alt=\"WDL side entry cryogenic ball valve manufacturing and inspection\" width=\"1024\" height=\"576\" \/><figcaption style=\"margin-top: 10px; color: #52606d; font-size: 14px;\">Project specifications should define materials, leakage acceptance<br \/>\nand cryogenic inspection requirements.<\/figcaption><\/figure>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">What Information Should an LNG Valve RFQ Include?<\/h2>\n<ol style=\"padding-left: 24px;\">\n<li>Valve size, pressure class and bore requirement<\/li>\n<li>Normal operating and minimum design temperature<\/li>\n<li>Maximum operating and design pressure<\/li>\n<li>Fluid composition and possible contaminants<\/li>\n<li>Two-piece or three-piece body preference<\/li>\n<li>\u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0643\u0631\u0629 \u0627\u0644\u0639\u0627\u0626\u0645\u0629 \u0623\u0648 \u0627\u0644\u0645\u062b\u0628\u062a\u0629 \u0639\u0644\u0649 \u0645\u062d\u0648\u0631 \u062f\u0648\u0631\u0627\u0646<\/li>\n<li>\u0645\u0639\u064a\u0627\u0631 \u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0637\u0631\u0641\u064a \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0648\u062c\u0647\u0627\u064b \u0644\u0648\u062c\u0647<\/li>\n<li>Body, ball, stem, seat, packing and bolting materials<\/li>\n<li>Cavity relief, seat direction and leakage requirements<\/li>\n<li>\u062a\u0634\u063a\u064a\u0644 \u064a\u062f\u0648\u064a \u0623\u0648 \u0647\u0648\u0627\u0626\u064a \u0623\u0648 \u0643\u0647\u0631\u0628\u0627\u0626\u064a<\/li>\n<li>Cryogenic, fire-safe and emission requirements<\/li>\n<li>Required drawings, certificates and inspection documents<\/li>\n<\/ol>\n<\/section>\n<section>\n<h2 style=\"font-size: 30px; line-height: 1.3; color: #0b2942;\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n<h3 style=\"font-size: 22px; color: #143852;\">What is the lowest published temperature for the WDL valve?<\/h3>\n<p>WDL publishes a minimum temperature of \u2212196\u00b0C. The final allowable<br \/>\nlimit depends on the material, seat, packing, pressure rating and<br \/>\napproved project design.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">Why is an extended stem required?<\/h3>\n<p>The extended stem moves the packing and operating mechanism away<br \/>\nfrom the cold process zone and above the pipe insulation, helping<br \/>\ncontrol frost and stem leakage.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">Can a standard ball valve be used for LNG?<\/h3>\n<p>A standard ambient-temperature ball valve should not be assumed<br \/>\nsuitable. LNG service requires verified low-temperature<br \/>\nmaterials, seals, cavity relief, stem extension and appropriate<br \/>\ncryogenic testing.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">Is a soft seat or metal seat better?<\/h3>\n<p>A soft seat is often selected for tight shutoff in clean LNG<br \/>\nservice. A metal seat may be needed for particles, severe cycling,<br \/>\nwear or specific fire and temperature conditions. The process<br \/>\ndatasheet determines the correct choice.<\/p>\n<h3 style=\"font-size: 22px; color: #143852;\">What documents can be requested?<\/h3>\n<p>Typical documents include material certificates, pressure-test<br \/>\nreports, cryogenic test records, NDE reports, fire-safe or<br \/>\nemission evidence, cleanliness records and approved drawings.<\/p>\n<\/section>\n<aside style=\"margin-top: 34px; padding: 24px; background: #eaf2f8; border-left: 5px solid #1261a0; border-radius: 6px;\">\n<h2 style=\"margin-top: 0; font-size: 27px; color: #0b2942;\">Discuss Your LNG Valve Requirement<\/h2>\n<p>Send WDL Valve your LNG process datasheet. Our team can review the<br \/>\npressure class, minimum temperature, body construction, materials,<br \/>\nseat system, cavity relief and testing requirements.<\/p>\n<p style=\"margin-bottom: 0;\"><a style=\"display: inline-block; padding: 11px 20px; background: #1261a0; color: #fff; text-decoration: none; border-radius: 5px; font-weight: bold;\" href=\"https:\/\/wdlvalve.com\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d9%86%d8%a7\/\">\u0637\u0644\u0628 \u0645\u0631\u0627\u062c\u0639\u0629 \u0641\u0646\u064a\u0629<br \/>\n<\/a><\/p>\n<\/aside>\n<footer style=\"margin-top: 26px; padding-top: 18px; border-top: 1px solid #cbd5df; color: #52606d; font-size: 14px;\">\n<p style=\"margin: 0;\"><strong>\u0627\u0644\u0645\u0624\u0644\u0641:<\/strong> \u0648\u0648\u0646\u063a \u0648. \u0628.\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a\u060c,<br \/>\n\u0634\u0631\u0643\u0629 \u0634\u064a\u0627\u0645\u0646 WDL \u0644\u0644\u0635\u0645\u0627\u0645\u0627\u062a \u0627\u0644\u0645\u062d\u062f\u0648\u062f\u0629.<\/p>\n<\/footer>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>\u064a\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0643\u0631\u0648\u064a \u0627\u0644\u0645\u0628\u0631\u062f \u0630\u0648 \u0627\u0644\u0645\u062f\u062e\u0644 \u0627\u0644\u062c\u0627\u0646\u0628\u064a \u0627\u0644\u0645\u062e\u0635\u0635 \u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0627\u062a \u0627\u0644\u063a\u0627\u0632 \u0627\u0644\u0637\u0628\u064a\u0639\u064a \u0627\u0644\u0645\u0633\u0627\u0644 (LNG) \u0647\u064a\u0643\u0644\u0627\u064b \u0645\u0643\u0648\u0646\u0627\u064b \u0645\u0646 \u0642\u0637\u0639\u062a\u064a\u0646 \u0623\u0648 \u062b\u0644\u0627\u062b \u0642\u0637\u0639\u060c \u0648\u0645\u0648\u0627\u062f \u0645\u0642\u0627\u0648\u0645\u0629 \u0644\u062f\u0631\u062c\u0627\u062a \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0627\u0644\u0645\u0646\u062e\u0641\u0636\u0629\u060c \u0648\u0633\u0627\u0642\u0627\u064b \u0645\u0645\u062a\u062f\u0629 \u0644\u062a\u0648\u0641\u064a\u0631 \u0639\u0632\u0644 \u0645\u0648\u062b\u0648\u0642 \u0628\u0647 \u0628\u0631\u0628\u0639 \u062f\u0648\u0631\u0629 \u0639\u0646\u062f \u062f\u0631\u062c\u0627\u062a \u062d\u0631\u0627\u0631\u0629 \u062a\u0635\u0644 \u0625\u0644\u0649 \u2212196 \u062f\u0631\u062c\u0629 \u0645\u0626\u0648\u064a\u0629. \u0648\u064a\u064f\u0639\u062f \u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0635\u062d\u064a\u062d \u0644\u0644\u0645\u0642\u0639\u062f\u060c \u0648\u062a\u0641\u0631\u064a\u063a \u062a\u062c\u0648\u064a\u0641 \u0627\u0644\u062c\u0633\u0645\u060c \u0648\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631\u0627\u062a \u0627\u0644\u0645\u0628\u0631\u062f\u0629 \u0623\u0645\u0648\u0631\u064b\u0627 \u0623\u0633\u0627\u0633\u064a\u0629 \u0644\u0623\u0646 \u0627\u0644\u063a\u0627\u0632 \u0627\u0644\u0637\u0628\u064a\u0639\u064a \u0627\u0644\u0645\u0633\u0627\u0644 \u0627\u0644\u0645\u062d\u0628\u0648\u0633 \u064a\u062a\u0648\u0633\u0639 \u0628\u0633\u0631\u0639\u0629 \u0639\u0646\u062f \u0627\u0631\u062a\u0641\u0627\u0639 \u062f\u0631\u062c\u0629 \u062d\u0631\u0627\u0631\u062a\u0647. \u0627\u0644\u0635\u0645\u0627\u0645 \u0627\u0644\u0643\u0631\u0648\u064a \u0627\u0644\u0645\u0628\u0631\u062f \u0630\u0648 \u0627\u0644\u0645\u062f\u062e\u0644 \u0627\u0644\u062c\u0627\u0646\u0628\u064a \u0645\u0646 WDL\u2026<\/p>","protected":false},"author":1,"featured_media":1157,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"default","_kad_post_title":"default","_kad_post_layout":"default","_kad_post_sidebar_id":"","_kad_post_content_style":"default","_kad_post_vertical_padding":"default","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[52],"tags":[],"class_list":["post-1160","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/posts\/1160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/comments?post=1160"}],"version-history":[{"count":2,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/posts\/1160\/revisions"}],"predecessor-version":[{"id":1162,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/posts\/1160\/revisions\/1162"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/media\/1157"}],"wp:attachment":[{"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/media?parent=1160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/categories?post=1160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wdlvalve.com\/ar\/wp-json\/wp\/v2\/tags?post=1160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}